|
Maintenance work which started on April the 16th (until the 19th of June) - the bridge's main cables are being inspected - will result in a contraflow system which will be in operation from 2.30am until 4.00pm in the afternoon.
Pars supporters travelling south (i.e. from Fife) would be better off driving through Rosyth or Inverkeithing (ferry toll) before joining at the last junction which will lead you into the contraflow system.
The council have advised drivers to expect delays both ways, although with the lanes returning to normal at 4.00pm, the journey home should be pretty straight-forward - depending on the result that is!